Do you have a building regulations completion certificate?

24 November 2026

Make an enquiry
Construction worker wearing a hard hat and high-visibility vest reviews paperwork on a clipboard beside scaffolding.

It’s one of the most common questions your solicitor will ask during a property transaction, and it often catches sellers off guard.

You had a new kitchen fitted 10 years ago, or a loft conversion done before you even moved in, and now your solicitor wants to see a building regulations completion certificate for it.

This isn’t the same as planning permission — they are two separate things, and your solicitor checks for both. So, what is a building regulations completion certificate, and why does it matter?

The answer lies in building regulations, a set of rules that apply to most structural and significant works carried out on a property. Understanding why your solicitor asks about them, and what happens if the paperwork is missing, can save a lot of stress during your sale or purchase.

We’ll cover planning permission separately towards the end of this article.

What are building regulations?

Building regulations are minimum standards set by law for the design, construction and alteration of buildings. They exist to make sure that work carried out on a property is safe, energy efficient and fit for purpose.

They cover things like structural stability, fire safety, ventilation, drainage and electrical and gas installations.

In England, building regulations are enforced either by your local authority’s Building Control team or by a private registered building control approver, sometimes still referred to by their old name ‘Approved Inspector’.

When work that requires building regulations approval is completed, the relevant body issues a completion certificate or, in the case of a registered building control approver, a final certificate, confirming the work has been inspected and meets the required standards.

Importantly, from a health and safety perspective, this certificate is your confirmation that the work was carried out and completed to the building standards of the day.

What kind of work needs building regulations approval?

More than you might think. Common examples include:

  • Loft conversions
  • Extensions, including conservatories in many cases
  • Structural alterations, such as removing a load-bearing wall
  • Electrical rewiring or new circuits
  • Replacement windows and external doors
  • Installation or replacement of a boiler or heating system
  • Converting a garage into a living space.

It’s worth noting that building regulations are separate from planning permission. You might need one, both or neither depending on the work. Your solicitor checks for both.

Why does my solicitor ask for the certificate?

When you buy a property, your solicitor needs to confirm that any works carried out comply with building regulations. A missing completion certificate means there’s no formal confirmation that the work was done to the required standard.

That creates a risk for the buyer, because:

  • Without the certificate, there’s no independent confirmation that the work meets health and safety standards, which could mean anything from inadequate fire protection to unsafe structural alterations
  • The local authority has the power to require the owner to alter or remove non-compliant work
  • A mortgage lender may refuse to lend on a property where building regulations compliance cannot be demonstrated
  • Your buildings insurance could be affected. If something goes wrong as a result of non-compliant work — for example, a fire caused by faulty electrics or a structural failure — your insurer may refuse or reduce a claim
  • If you later come to sell, the next buyer’s solicitor will raise the same question, and the problem passes down the chain.

In short, your solicitor is protecting you from inheriting someone else’s paperwork problem.

What if the certificate is missing?

This happens more often than you might expect, particularly with older works or where a previous owner carried out improvements without going through the formal process. There are a few options:

Regularisation

In some cases, the local authority can retrospectively inspect the work and, if it meets the standards, issue a regularisation certificate.

This is the gold-standard solution, but it can take time and may involve opening up parts of the building for inspection. If the work doesn’t meet the required standards, the local authority will not issue the certificate until remedial work has been carried out to bring it up to standard, which can add cost and delay.

For that reason, regularisation is not always practical mid-transaction.

Indemnity insurance

Where regularisation is not feasible or would delay the transaction, your solicitor may recommend an indemnity policy. This is a one-off, low-cost insurance policy that protects the buyer and their lender against the risk of the local authority taking enforcement action. These policies are widely used and accepted by most mortgage lenders.

There is one very important rule with indemnity policies: you must not contact the local authority about the works before taking out the policy.

This catches people out because it feels counterintuitive. Surely it would be helpful to check with the council first? The problem is that indemnity policies are designed to cover the risk of the local authority taking enforcement action.

If you draw the council’s attention to the work before the policy is in place, it may decide to investigate. Once it is aware of the works and actively looking into them, the insurer may not provide cover.

In effect, contacting the council turns a theoretical risk into a live one, and the policy will not respond to a risk you have created. Your solicitor will always warn you about this before any contact is made.

Is there a time limit on enforcement?

This is an area where the law has recently changed, and the change is more significant than many people realise.

Under the original rules in the Building Act 1984, a local authority had just 12 months from the date the work was completed to serve a notice requiring the owner to alter or remove non-compliant work. In practice, that was a very short window.

The Building Safety Act 2022 changed that. Local authorities now have up to 10 years from the date the work was completed to take enforcement action. On top of that, the criminal offence of contravening building regulations can now be prosecuted in the Crown Court, removing the previous time limit for bringing prosecutions altogether.

So, what does this mean for you? For older works completed more than 10 years ago, the risk of the local authority requiring removal or alteration of the work under the building regulations has now passed. But for more recent works where the certificate is missing, the enforcement window is much wider than it used to be, and your solicitor will want either the certificate itself or an indemnity policy to cover the risk.

That said, the 10-year limit only applies to building regulations enforcement specifically. If work has created a genuinely dangerous situation, the local authority has separate powers to act regardless of when the work was done.

It’s important to understand, though, that the expiry of the enforcement window does not mean the work was safe or properly done. It simply means the council can no longer force you to put it right.

Remember, your solicitor checks the legal title to the property, not its physical condition, as they don’t visit the property. That’s why a survey is always recommended, whether or not a completion certificate is available. A surveyor can identify potential safety or structural issues that paperwork alone will never reveal, giving you the information you need to make an informed decision or negotiate accordingly.

Indemnity policies remain commonly used where the completion certificate is missing, particularly for works within the 10-year window. The risk may be low, but the policy provides a safety net that satisfies both the buyer and their lender.

What about planning permission?

Building regulations and planning permission are two separate regimes, but your solicitor checks for both. Planning permission controls what you can build, where and how it looks. Building regulations control how it is built.

Some works need planning permission but not building regulations approval, for example certain changes of use. Others need building regulations but not planning, such as a boiler replacement. Many need both.

If planning permission was required but not obtained, similar principles apply. There are enforcement time limits under planning law, and indemnity policies are available where those time limits have passed. Your solicitor will check for both and advise you on the best way forward.

The key takeaway

If your solicitor asks about building regulations certificates, completion certificates or whether works had the necessary approvals, it’s not because they’re being difficult. It’s because they’re making sure the property you are buying is safe, compliant and mortgageable, and that you won’t face problems when you come to sell.

Most of the time, any missing paperwork can be resolved, whether through a certificate, a regularisation application or a simple indemnity policy.